Day 2 - Construction Project Begins

The team was asked to build a wall on the property border made of solid concrete.  

This would match the wall already on the back of the property.  While some of the team unloaded the delivery truck filled with solid panels and long posts, the rest began digging.
We discovered that the best way to check the depth was to use a leg
Next is setting the posts.


Popular posts from this blog

First Day

Farewell Service